Framing Regional Authority Solar

  • Design, Furnish and Install New Long Span Carport Supporting a Photovoltaic System.
  •  Site Improvements to Accommodate New Structure That Included helical piles and Concrete footings.
  • Apply and Receive Interconnect Permit Thus Allowing for The Excess Power Back Into Grid
  •  Commission System and perform Start Up

Renewable Solar: Complex Construction

  • 59 days
  • 15000 plus hrs.’
  • 18210 panels
  •  97 miles of wire give or take
  •  Over 100,000 terminations
  • Complete primary service ¾ mile
  • Complete dc substation

Tunnel Lighting Retrofit Project

Electrical Contractor: Vene Promotions LLC as electrical subcontractor to primary electrical contractor, Tunnel Lighting Project: Demolition of existing tunnel lighting to allow for installation of all new LED lighting retrofit. Project completed in 2023.

Tunnel Lighting Project, Weston FL

Electrical Contractor: Vene Promotions LLC as subcontractor to primary contractor, Vene Promotions purchase, furnish and install LED lighting throughout the Sumner tunnel; and furnish controls. Prefabrication of lighting fixtures in prefab shops to allow for optimal project efficiency in installation.

The New Switchgear And VFD Control Center

Vene Promotions completed this work as part of the department of conservation and recreation (DCR) refrigeration systems replacements project at various rinks. The project was challenging due to the proximity to Pleasure Bay and the infiltration of sea water into the chiller room from the tidal cycles and storms. A steel grate platform was installed to elevate the new switchgear and VFD control center above the flood line and new feeders had to extend through the platform to the switchgear and transformer. The project consisted of complete replacement of the mechanical room chillers, pumps, piping, electrical switchgear, chemical treatment systems, and the cooling tower for the rink. The state-of-the-art control systems and all new energy-efficient equipment (with the capability to be monitored and controlled remotely via the internet) allows for enhanced efficiency and run times as well as considerable monthly savings on electricity used.

Building Renovation with LED Lighting

The project was a complete  building renovation including the total replacement of the mechanical room chillers, pumps, piping, electrical switchgear, chemical treatment systems, the cooling towers for the rink dehumidification system. It also included power for the new heating and cooling systems for the locker rooms, warming room, and management offices. The state-of-the-art control systems and all new energy-efficient equipment (with the capability to be monitored and controlled remotely via the internet) allows for enhanced efficiency and run times as well as considerable monthly savings on electricity used.
Services Provided: 

  • New LED high bay rink lighting and integrated locker room
  • Warming room and area lighting and lighting control